Gas and Solar Heating Installation for Derbyshire Police Station
EP Consulting completed a £200k project at Pear Tree Road Police Station in Derbyshire. This project involved the installation of a new gas-fired boiler plant complemented by solar-generated hot water systems, aimed at improving energy efficiency and reducing carbon emissions.
Scope of Work
Our team conducted feasibility studies and budget costing, provided detailed mechanical design, and integrated low-carbon and zero-carbon installations. The project included seamlessly integrating a gas-fired boiler with solar hot water systems, ensuring compliance with the latest sustainability standards.
Challenges and Solutions
The main challenge was integrating solar technology with the existing infrastructure while minimising operational disruptions. EP Consulting devised tailored solutions to combine traditional and renewable energy systems effectively, optimising energy use and reducing environmental impact.
Results and Impact
The new heating system at Pear Tree Road Police Station significantly reduces energy consumption and costs. EP Consulting's expertise in mechanical design and renewable energy installations has enabled the station to achieve greater sustainability, supporting the goal of reducing carbon emissions and promoting energy efficiency in public sector buildings.
Key Facts
Client
Derbyshire Constabulary
Sector
Renewable Technology
Value
£200k
Location
Derbyshire
Services
- Budget Costing
- Feasibility
- Low Carbon and Zero Carbon Installations
- Mechanical Design