Call Us: 0115 924 4433 | Email Us: |
EP Consulting Menu

Revitalising Healthcare at Nottingham City Hospital

At EP Consulting we are proud to be a trusted partner of Nottingham City Hospital, part of Nottingham University Hospitals NHS Trust. Nottingham City Hospital is central to our community here in Nottingham and our team of mechanical and electrical engineers has delivered a range of projects that enhance healthcare environments.

Transformative Refurbishments and Upgrades

One of our notable projects for Nottingham City Hospital was the £400,000 refurbishment and extension of the Brachytherapy & Superficial Unit. This significant upgrade involved modernising the unit’s mechanical and electrical systems and expanding its facilities to enhance patient care. Our team ensured minimal disruption to hospital operations while integrating the latest technology and sustainable solutions.

Our collaboration with Nottingham City Hospital includes several impactful projects:

•    The £160,000 four-phase refurbishment of the Chemotherapy Suite, which remained fully operational throughout the renovation.
•    The £500,000 upgrade of corridor lighting, executed over four phases, improving safety and visibility across the hospital. Essential Improvements for optimal functionality.

In addition to major refurbishments, we have completed many essential improvements including:

•    The £90,000 replacement glazing and access control system installation for the Boiler House.
•    The £150,000 air conditioning installation at Heathfield House, enhancing climate control and energy efficiency.

Commitment to Local Excellence

As a Nottingham-based business, our approach to every project reflects our commitment to both local and broader healthcare excellence. We conduct comprehensive feasibility studies, provide accurate budget costing, and ensure adherence to Part L2 Building Regulations, delivering projects that exceed expectations and contribute lasting value.

Our Notable Projects at Nottingham City Hospital

•    £400k Refurbishment and Extension of the Brachytherapy & Superficial Unit
•    £90k Boiler House Glazing Replacement and Access Control System
•    £160k Four-Phase Refurbishment of the Chemotherapy Suite
•    £120k Refurbishment of the Clinical Trials Unit
•    £500k Corridor Lighting Upgrade
•    £220k Refurbishment of Derwent Block A
•    £350k Edward Court Redevelopment
•    £450k External Lighting Refurbishment
•    £150k Air Conditioning Installation at Heathfield House
•    £29k Electrical Accessories Replacement in Lawrence Ward
•    £43k Nurse Call System Upgrade in Linden Lodge
•    £50k Modifications to Ante-Natal Room in Maternity Unit
•    £65k Utilities Provision for Mobile Breast Screening Units
•    £220k Modifications at National Breast Institute
•    £200k Re-Roofing of Out-Patients Department
•    £400k Nurse Call System Replacement in Patient Hotel
•    £200k Pay-on-Exit Car Park System Installation
•    £130k Control Systems Replacement in the Radiology Department
•    £150k Heating Infrastructure Upgrade at Trust HQ
•    £500k Fluoroscopy Unit

Key Facts

Client

Nottingham University Hospitals NHS Trust

Sector

Hospitals

Value

Up to £500k

Location

Nottingham

Services

  • Budget Costing
  • Electrical Design
  • Feasibility
  • Mechanical Design
  • Part L2 Building Regulations

Back to Portfolio

Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Cookies

This website uses cookies. Please let us know if you agree to the use of these cookies :
I Accept I Decline

Privacy Policy | 3rd Party Data Processors | Disable Cookies
Cookies