Buxton Police Station Heating System Replacement

EP Consulting played a key role in a £280k project to replace and upgrade the heating system at Buxton Police Station, enhancing efficiency and performance.

Scope of Work

The project involved replacing the entire heating distribution system, including emitters and distribution mains from the plant room. A new Trend iQ3 control system was installed, integrating seamlessly with the regional control system at Derbyshire Constabulary’s Headquarters in Ripley. This upgrade was designed to optimise heating performance and improve operational efficiency. 

EP Consulting provided comprehensive mechanical design services, including feasibility studies, budget costing, and detailed design. We produced a thermal model for the building to ensure optimal energy efficiency and created a BRUKL report. We ensured compliance with Part L2 Building Regulations and incorporated renewable energy solutions to meet sustainability objectives.

Challenges and Solutions

The primary challenge was upgrading the heating system while ensuring minimal disruption to daily operations. Our solution involved installing the Trend iQ3 control system, which offers advanced programmability and remote access features. This integration allows for streamlined management of the heating system, enhancing operational efficiency and ensuring that the new system operates at peak performance with reduced manual intervention.

Results and Impact

The upgraded heating system now features a modern and efficient distribution network, significantly improving the building’s heating performance. The Trend iQ3 control system’s benefits include enhanced operational efficiency, energy savings through real-time monitoring and optimisation, and improved flexibility with remote management capabilities. The system’s integration with the regional headquarters allows for centralised control, contributing to streamlined operations and reduced energy costs.

Managed by Focus Consultants, the project was completed within 16 weeks and showcases EP Consulting’s expertise in delivering sustainable, high-quality mechanical solutions that enhance both performance and efficiency.

Key Facts

Client

Derbyshire Constabulary

Sector

Emergency Services

Value

£280k

Location

Buxton

Services

  • BRUKL
  • Budget Costing
  • Feasibility
  • Mechanical Design
  • Part L2 Building Regulations
  • Renewable Energy Solutions
  • Thermal Modelling

Back to Portfolio

Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Constructionline
Fusion21
Chartered
Cibse
Lcea
Iet
Iheem
Cookies

This website uses cookies. Please let us know if you agree to the use of these cookies :
I Accept I Decline

Privacy Policy | 3rd Party Data Processors | Disable Cookies
Cookies