A £109k boiler replacement scheme for Shropshire Community Health NHS Trust.

Our design included new boiler plant and flues, buffer vessel heating circulation pumps, variable temperature heating circulation pumps, sealed system pressurisation unit, heating and hot water primary pipework in the plant room and connections into existing services distribution pipework, and boiler condense drainage. Within the plant room modifications to the mains cold water distribution pipework and existing gas pipework were required to suit the new plant layout, together with modifications to the existing Trend IQ3 Mechanical Services Control Panel and the provision of all necessary power and controls wiring.

The project included the removal of the existing six Keston gas fired boilers, variable temperature heating distribution pumps and associated heating pipework within the plant room, together with the removal of the existing gas boiler flues, heating system pressurisation unit, expansion vessel and associated pipework and redundant controls.


Project Manager: Focus Consultants

Contract Duration: 8 weeks

Total Contract Value: £109k