Building Services Engineers

New College Nottingham

Location: Nottingham

Click Here To Enlarge

A rolling £1.2m 4 year contract for the provision of mechanical and electrical services for various projects across a number of campuses including the refurbishment of existing wet laboratories at the Basford Hall Campus; the relocation of laboratories at Stoney Street Campus; a new fire alarm and emergency lighting installation within the Construction buildings at Basford Hall Campus; a new fire alarm installation to the Bath Street Campus; and modifications to various teaching areas and amenity services within Basford Hall Campus. These projects included lighting, emergency lighting, 13A power, access control systems, fire alarm systems, intruder alarm systems, CCTV systems, heating, ventilation, hot and cold water services, and gas installations.


Contract Duration: 4 years rolling contract

Contract Value: £1.2m


Roles

Feasibility

Budget Costing

Mechanical Design

Electrical Design

EPC / BRUKL

Low Carbon and Zero Carbon Installations

Renewable Energy Solutions

BREEAM

Part L2 Building Regulations

SBEM Calculations and Thermal Modelling

Back To List

Get In Touch

Telephone: 0115 924 4433
Email:

Send Us A Message

***

We have placed cookies on your device to help make this website better. You can click the link below to disable cookies, otherwise, we'll assume you're happy to continue
Close This Notice

Disable Cookies | 3rd Party Data Processors